The Challenge

 

These townhome buildings needed to be completely constructed, set, and ready for entry before the hotel could be opened.

 

Extreme snow loads of 235 lb/sf at the high elevation required special framing and structural connection details.

 

Large and complex building roof systems needed to be constructed. Winter weather and strong storms made traditional construction impossible.

The Solution

 

The project was built, shipped, and installed by November 2007 in this mountain community of Mammoth Lakes, California.

 

To avoid the pending winter storms, the buildings were delivered, set, and installed in a matter of days. The buildings were ready for sale by March 1.

 

Speed was a critical factor in the modular home project, and modular construction saved a remarkable amount of time and money!

Efficiency, Quality, Speed

 

To avoid the pending winter storms, the buildings were delivered, set, and installed in a matter of days.

 

With Modular Building

 

Extreme snow loads of 235 lb/sf at the high elevation required special framing and structural connection details.

Large and complex building roof systems were built as modules and crane was set into place as part of the installation process.

The Scope Of Work

Installation and Assembly

Fast installation of the home and efficient assembly on site was required for the project

Structural Connections

Structural Connections were build to ensure a strong frame and tight, sound result

Roofing Completion

Roofing Completion was accomplish on schedule

Selected Interior Finishing

Selected interior finishing gave the home its cozy, distinctive touch

  • Time Saved 80% 80%
  • Costs Saved 50% 50%
  • Whatever Metric We Can Measure Here 50% 50%

Days of Construction

Number of Days Expected

Nothing is Impossible With Modular

 

Winter construction would have been impossible with stick frame methods!